USCG 110’ WPB

Chand developed the logistics support package for the WPBs during the design and construction phase. CHAND developed:

Short Form Provisioning Technical Documentation (PTD)

Supply Support
• Storeroom Items (SRI)
• Onboard Stowage Items (OSI)
• Packaging, Handling, Storage, and Transportability (PHS&T)

Commercial Technical Manuals (COTS)
• Cutter Information Book (CIB)
• Preventive Maintenance System (PMS)
• Familiarization Training
• Post Training Video Tapes
• Factory Equipment Training

CHAND is continuing to provide Life Cycle Support to the existing 110’ WPBs.